2 Chronicles 3:1-8 NIV

Solomon Builds the Temple

1 Then Solomon began to build the temple of the LORD in Jerusalem on Mount Moriah, where the LORD had appeared to his father David. It was on the threshing floor of Araunaha the Jebusite, the place provided by David.

References for 2 Chronicles 3:1

    • j 3:1 - Hebrew "Ornan," a variant of "Araunah"
      2 He began building on the second day of the second month in the fourth year of his reign.

      References for 2 Chronicles 3:2

      3 The foundation Solomon laid for building the temple of God was sixty cubits long and twenty cubits wideb (using the cubit of the old standard).

      References for 2 Chronicles 3:3

        • k 3:3 - That is, about 90 feet long and 30 feet wide or about 27 meters long and 9 meters wide
          4 The portico at the front of the temple was twenty cubitsc long across the width of the building and twentyd cubits high. He overlaid the inside with pure gold.

          References for 2 Chronicles 3:4

            • l 3:4 - That is, about 30 feet or about 9 meters; also in verses 8, 11 and 13
            • m 3:4 - Some Septuagint and Syriac manuscripts; Hebrew "and a hundred and twenty"
              5 He paneled the main hall with juniper and covered it with fine gold and decorated it with palm tree and chain designs.

              References for 2 Chronicles 3:5

              6 He adorned the temple with precious stones. And the gold he used was gold of Parvaim.
              7 He overlaid the ceiling beams, doorframes, walls and doors of the temple with gold, and he carved cherubim on the walls.

              References for 2 Chronicles 3:7

              8 He built the Most Holy Place, its length corresponding to the width of the temple—twenty cubits long and twenty cubits wide. He overlaid the inside with six hundred talentse of fine gold.

              References for 2 Chronicles 3:8

                • n 3:8 - That is, about 23 tons or about 21 metric tons